Southern Railway
About
The Southern Railway (SR) was the smallest by mileage of the British Big Four railways and arguably the most coherent, its three constituents at the 1923 Grouping (LSWR, LBSCR and SECR) all served the populous and lucrative London commuter belt, the Channel ports and the south-coast resorts. Its territory ran from London southward to Portsmouth, Southampton, Brighton, Dover and Plymouth.
The Southern's defining engineering policy was electrification. Building on the LSWR and LBSCR's pre-Grouping schemes, the company adopted the LSWR's 660 V (later 750 V) dc third-rail system as its standard and progressively electrified its dense suburban network and the principal main lines south of London. By 1939 the SR had the largest electrified suburban network in the world. The 1932 Brighton Line and 1937 Portsmouth Direct main-line electrifications produced the all-electric 'Brighton Belle' and Portsmouth services that survived through to 1972 and beyond.
Locomotive engineering was led by Richard Maunsell (1923–1937) and Oliver Bulleid (1937–1948). Maunsell produced the King Arthur, Lord Nelson and Schools express classes; Bulleid the air-smoothed Merchant Navy (1941), West Country (1945) and Battle of Britain Pacifics, and the austere Q1 0-6-0 of 1942.
At nationalisation on 1 January 1948 the SR became the Southern Region of British Railways. The Region continued to favour third-rail dc electrification long after BR's national policy had moved to 25 kV AC, and operated Merchant Navy Pacifics on the Bournemouth Belle and other premier expresses to 1967.